Product Description
RV sequence Traits
- RV – Sizes:030-040-050-063-075-one hundred and five-110-a hundred thirty-one hundred fifty
- Input Options: with enter shaft, With Sq. flange,With Input Flange
- Input CZPT .06 to 11 kW
- RV-Dimensions from 030 to 105 in die-solid aluminium alloy budy and over a hundred and ten in cast iron
- Ratios amongst 5 and a hundred
- Max torque 1550 N.m and admissible output radial loads max 8771 N
- Aluminium models are provided total with synthetic oil and let for CZPT mounting positions, with no want to modify lubricant quantity
- Worm wheel: Copper (KK Cu).
- Loading capacity in accordance with: ISO 9001:2015/GB/T 19001-2016
- Measurement 030 and over are painted with RAL 5571 blue
- Worm equipment reducers are CZPT with diffferent mixtures: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Options: torque arm, output flange, viton oil seals, low/high temperature oil, filling/drain/breather/level plug,Little hole
Basic models can be applied to a vast assortment of CZPT reduction ratios from 5 to a thousand.
Warranty: One year from day of delivery.
WORM GEARBOX | |||||
SNW SERIES | Output CZPT Range: | ||||
Sort | Outdated Kind | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | φ14 | Relevant CZPT CZPT : | |
SNW040 | RV040 | 45N.m | φ19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | φ25 | Enter Options1: | |
SNW063 | RV063 | 160N.m | φ25 | With Inline AC CZPT | |
SNW075 | RV075 | 230N.m | φ28 | Enter Options2: | |
SNW090 | RV090 | 410N.m | φ35 | With Square flange | |
SNW105 | RV105 | 630N.m | φ42 | Input Options3: | |
SNW110 | RV110 | 725N.m | φ42 | With Input Shaft | |
SNW130 | RV130 | 1050N.m | φ45 | Input Options4: | |
SNW150 | RV150 | 1550N.m | φ50 | With Enter Flange |
Starshine CZPT
ZheJiang CZPT glow CZPT Co.,Ltd,the predecessor was a point out-owned army mould enterprise, was recognized in 1965. CZPT shine specializes in the complete CZPT transmission solution for large-end tools manufacturing industries based mostly on the goal of “Platform Merchandise, Software Layout and Skilled Services”.
Starshine have a sturdy technological power with above 350 employees at current, including over 30 CZPT technicians, thirty top quality inspectors, covering an spot of 80000 square meters and types of CZPT d processing machines and screening equipments. We have a good foundation for the business application advancement and provider of higher-conclude velocity reducers & variators proudly owning to the provincial CZPT technology study heart,the lab of gear speed reducers, and the foundation of present day R&D.
Our Staff
Good quality Management
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Packing
Supply
As the most compact modest precision gear method, worm gear sets give higher reduction ratios in a really modest area. Worm equipment sets transmit movement among disjoint appropriate-angle shafts and give the quietest, smoothest operating operation of any equipment type.